Client: University of WA
Builder: BSG Construction
Project: UWA Business School
Scaffold required to fix façade cladding, curtain glazing and lining to six metre wide eaves. A massive amount of scaffold was deployed and erected at once to the full height and full perimeter of the building.
This enabled the initial building structures to be completed without the site restrictions of a full perimeter scaffold. Safety was maintained during erection of the building structure with the use of AXS Management edge protection systems only.
Application:
- Full perimeter multi-deck scaffold [1]
- Birdcage scaffold [4]
- Circular work [5]
- Loading bay [11]
- Stair access [13]
- Hoist enclosure [14]
- Edge protection [16]
- Rubbish disposal [26]